Training · Gas turbine · GT-13

Mark VI Operation and Maintenance

5 days · English or French · Canada or Dubai

Typical audience

Operators, maintenance engineers, controls technicians, supervisors and planners

Course outline

Day 1

  • Introduction Speedtronic Mark VI GE Gas Turbine Fundamentals and control basics.
  • System overview and Architecture Panel, modular concept discussion
  • Mark VI cards
  • Internal and external Mark VI wiring
  • Hardware documentation
  • The main protection system VPRO
  • Supply voltage.

Day 2

  • Data structure of the operator interface Brief discussion of the Windows 2000/XP based operator interface
  • Most important files of the operator interface and their function
  • Failure of the operator interface, what to do.
  • Communications with the operator interface, Ethernet and DCS communications
  • Operator interface facilities, TOOLBOX and Cimplicity Watch Windows
  • The M6B file, functions, modules and tasks
  • The Finder
  • Trip log
  • Alarm display
  • Trouble shooting procedure
  • Control constants
  • Mark VI tools (TOOLBOX practice) Trend Recorder, Historical trip display, Alarms and SOE's

Day 3

  • Mark VI software structure M6B file, MKVI I/O and functions Programming languages of the Mark VI Macro's and Modules
  • Practice: Making Mark VI software with TOOLBOX Digital input.
  • Analog input with software by students
  • Digital input with software example by Students
  • Gas turbine sequence Control modes
  • Start up and permissive for start
  • IGV sequence
  • Normal stop
  • Emergency stop
  • Discussion of the following controls and sequencing Fuel control
  • Start up, Speed, Acceleration, Temperature, Shut-down control and Manual FSR control Special control loops Inlet Guide Vane, Anti icing, Water / steam injection and Start and stop.
  • Control loops The protection systems Flame detection, Overspeed, Vibration, Exhaust temperature, Lube oil pressure and temperature, Fire protection system.
  • Discussion of the following controls and sequencing Synchronization, auto and manual Power factor control MVAR control
  • Dry Low NOx Explanation of the system
  • Discussion of the controls, implementation in Mark VI
  • controls and logics

Day 4

  • Trouble shooting, alarm analysis and limited software changes in practice Diagnostics of card failure-Card replacement procedure.
  • Alarm display-Setup and configuration
  • Alarm Management (flow chart explanation)
  • Exercise of different simulated alarms trouble shooting
  • Changing control constants, adding alarms
  • Trip Log display and interpretation.

Day 5

  • Trouble shooting using simulation Configuring Trip log display
  • Adding Sequencing (CI, CO etc.), Build, Downloading, HMI device
  • Configuring a new Cimplicity screen.
  • Case study: Unit "not ready to start". Start Checks, Trip logs. First failure analyses for trips (emergency stop)
  • Class Discussion and Evaluation of the course

Course registration

Choose a course

Course details
Participant details
Mode of payment
Company contact details for invoicing

We use these details only to process your registration. They are never shared with third parties. A confirmation is sent to the email address you provide.